EMT Conduit Installation Time: Estimate installation time of Electrical Metallic Tubing conduit based on the length of conduit, size of conduit and level of difficulty.
GRC Conduit Installation Time: Estimate installation time of Galvanized Rigid Conduit based on length of conduit, size of conduit and level of difficulty.
PVC 40 Conduit Installation Time: Estimate installation time of PVC Schedule 40 conduit based on length of conduit. size of the conduit and level of difficulty.
Metal Clad Cable Installation Time: Estimate installation time of Metal Clad Cable based on length of conduit. size of the conduit and level of difficulty.
Lamp Lay-in Fixture Installation Time: Estimate the installation time for lamp lay-in fixtures based on size of the fixtures, level of difficulty and number of fixtures.
20A Duplex Outlet Installation Time: Estimate the installation time for 20 Amp Duplex Outlets based on the level of difficulty and number of outlets.
20A SP Switch Installation Time: Estimate the installation time for 20 Amp Switches based on the level of difficulty and number of switches.
Conduit Weight Estimates
EMT Conduit Weight: Estimate the weight of Electrical Metallic Tubing based on the size of the tubing and the length.
GRC Conduit Weight: Estimate the weight of Galvanized Rigid Conduit based on the size and length of the conduit.
PVC Schedule 40 Weight: Estimate the weight of Schedule 40 PVC based on the size, length and whether it is PVC or CPVC.
Metal Clad Cable Weight: Estimate the weight of metal clad cable based on the size and the length.
Wiring and Box Estimates
Outlets and Wiring for a Room: Computes the number of outlets (boxes) and length of wire to connect them in a room based on the room dimensions and the outlet spacing.